Our electric grid is under intense strain — overextended, aging, and increasingly out of sync with the explosive growth in demand.
6 open now, 6 first appeared in the last 30d.
| Title ↕ | Location ↕ | Posted ↓ |
|---|---|---|
| Reliability Engineering Lead | Scotts Valley | 3d |
| PCBA Rework Technician | Scotts Valley | 4d |
| Senior Manufacturing Test Engineer - Power Electronics | Scotts Valley | 4d |
| Electrical / Electronics Design Engineer - PCBA Test Automation | Scotts Valley | 4d |
| Hardware Validation Systems Developer | Scotts Valley | 4d |
| Software Engineer | Remote | 1w |